Library Operating Hours for Sunday, 30 June 2024 : 8.00AM - 5.00PM
Home

Links

Significance of project management performance assessment (PMPA) model
Posted on 31 December 2012 by Mohd Afiq Bin Rusly ()
Abstract

Bryde (Bryde JD. Modelling project management performance. Int J Quality Reliab Manage 2003;20(2):229–25) has presented project management performance assessment (PMPA) model. The model proposes six criteria for assessing PM performance; based upon the EFQM business excellence model. This paper examines what is the level of impact of these criteria over the project management performance (PMP) in Pakistani listed organizations. This paper also examine the scope of the association within different criteria of project management performance assessment (PMPA) model and with project management performance (PMP) in the Pakistani listed organizations and whether this association is significant, furthermore it investigate that to which extent different characteristics of PM performance, correlate with each other and with project management performance (PMP). It is concluded that the PMPA model have a potential use as framework to assess the project management performance, by conducting empirical study and checking the impact, correlation and association of the criteria of PMPA model and PMP.

Article Information
Database: 
ScienceDirect

Copyright© Library, OUM 2013, All Rights Reserved
Latest updated: 23th July 2013

Get in touch with us