Items where Subject is "T Technology > TS Manufactures"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: G | H | K | L | M | N | O | P | R | S | T | V
Number of items at this level: 26.

G

Gopi Simathari, (2021) Improve the productivity of rubber bushings in a rubber moulding company by applying the Lean Principle. Masters thesis, Open University Malaysia.

H

Halim , Tony and Kanesan , Muthusamy (2012) Fuzzy Available-to-Promise System Modelling Under Supplier Uncertainty. Advanced Materials Research (AMR). pp. 383-390. ISSN 1022-6680

Ho , Kok Hoe and Kanesan , Muthusamy and Harikrishnan , Kanthen (2011) An Intelligent Model Using Excel Spread Sheet in a Manufacturing System. In: The 19th Triennial Conference of the International Federation of Operational Research Societies (IFORS2011), 10-15 July 2011, Melbourne.

Ho , Kok Hoe and Kanesan , Muthusamy and Harikrishnan , Kanthen (2012) An Intelligent Process Model for Manufacturing System Optimization. Advanced Materials Research (AMR). ISSN 1022-6680

K

Kanesan , Muthusamy and Ishii, Hiroaki (2000) Scheduling Problem with Fuzzy Due-dates on Unrelated Parallel Processors. In: The Fifth Conference of the Association of Asian-Pacific Operational Research Societies within IFORS, APORS'2000, Singapore.

Kanesan , Muthusamy and Ishii, Hiroaki and Mohri, Shintaro and Masuda, Teruo (2000) Beam Search Approach for the Multiobjective Flow-shop Scheduling Problem. In: Scheduling Symposium 2000, Hamamatsu, Japan.

Kanesan , Muthusamy and Ishii, Hiroaki and Mohri, Shintaro and Teruo, Masuda (2001) Single machine batching problem to minimize the sum of completion times with number of batches and batch size limitations. Scientiae Mathematicae Japonicae, 55 (2). pp. 369-381. ISSN 1346-0447

Kanesan , Muthusamy and Ishii, Hiroaki and Vlach, Milan (1999) Scheduling problems with generalized precedence relations. In: The Second Asia-Pacific Conference on Industrial Engineering and Management Systems, Kanazawa, Japan, Kanazawa, Japan. (Submitted)

Kanesan , Muthusamy and Noguchi, Hiroshi (2005) ISO 9000 and Statistical Science (in Japanese). Journal of Standardization and Quality Control, 58 (2). pp. 29-36.

Kanesan , Muthusamy and Noguchi, Hiroshi (2005) Six Sigma : The Way Forward (in Japanese). Standardization and Quality Control , 58 (2). 25-28 .

Kanesan , Muthusamy and Shao, Chin Sung and Vlach , Milan and Ishii, Hiroaki (2003) Scheduling with fuzzy delays and fuzzy precedences. Fuzzy Sets and Systems (134). pp. 387-395. ISSN 0165-0114

L

Lee, ST and Kanesan , Muthusamy and Harikrishnan , Kanthen (2011) ISO 9000, Six-Sigma or Toyota Production System: Are These TQM Methods Complementary or Contradictory to One Another? In: The 2011 Fall National Conference of Operations Research Society of Japan, 16-17 Sept 2011, Kobe, Japan.

M

Mohamad Hafiz Mohd Rosli, (2020) Total Productive Maintenance (TPM) approach to improve Overall Equipment Efficiency (OEE) in Robert Bosch Automotive Steering Sdn. Bhd. Open University Malaysia. (Unpublished)

Mohd Rosli Amir Husin, (2018) Work-related musculoskeletal disorders (wmsds) complaints among workers at aluminium smelting company at Bukit Raja, Klang. Open University Malaysia. (Unpublished)

Muhammad Dhiauddin Mohamed Suffian, and Suhaimi Ibrahim, (2012) Application of Six Sigma Approach in Predicting Functional Defects for System Testing. ICCIT 2012.

Murelitharan, Muniandy and Kanesan , Muthusamy (2012) An Innovative Drive Train Design for Improved Dead Reckoning Accuracy in Automated Guided Vehicles. Advanced Materials Research (AMR), 383-390. ISSN 1022-6680

N

Nadiah binti Din, (2020) Kepentingan pelaksanaan keselamatan ergonomik kepada pelajar ketika menjalani amali di makmal dan bengkel Politeknik Sultan Salahuddin Abdul Aziz Shah (PSA). Open University Malaysia. (Unpublished)

O

Ong, Su Hoon (2020) A solution for reducing the ergonomic problem among semiconductors workes by using safe work procedures. Open University Malaysia. (Unpublished)

P

Puspavathi, S. Rama Naidu (2021) A study on time based for visual inspectors at Western Digital Batu Kawan production line. Masters thesis, Open University Malaysia.

R

Rohaya Ali, (2011) Getting ready for internal audit (Part 1). In: OUM Seminar Series 02/2011, 3 March 2011, Theatrette, Open University Malaysia . (Unpublished)

Ruzita Ramly, (2011) Getting ready for internal audit (Part 2). In: OUM Seminar Series 02/2011, 3 March 2011, Theatrette, Open University Malaysia . (Unpublished)

S

Sivakumar, Supperamaniam and Kanesan , Muthusamy (2011) Critical Success Factors in Six Sigma Implementation - A Case Study of MNCs in Malaysia. In: The 2011 IEEE International Conference on Quality and Reliability, 14-17 Sept 2011, Bangkok, Thailand.

T

Tony, Halim and Kanesan , Muthusamy (2009) Research opportunities for the management of engineering services using systems engineering. In: International Conference for Technical Postgraduates (TECHPOS), 14 Dec 2009, Kuala Lumpur.

V

Venkataraman , Narayanaswamy and Kanesan , Muthusamy Sustainability Index Benchmarking in a Semiconductor Manufacturing Environment. Advanced Materials Research (AMR). pp. 383-390. ISSN 1022-6680

Venkataraman , Narayanaswamy and Kanesan , Muthusamy (2011) Impact of International Environmental Management System on Sustainability Index benchmarking for Small and Medium Enterprise. In: OIDA International Conference on Sustainable Development, 5-7 December 2011, Palm Garden Hotel, IOI Resort Putrajaya. (Submitted)

Ventakaraman , Padmaja (2008) Material stock requirement list system (MSRL). Masters thesis, Open University Malaysia (OUM).

This list was generated on Tue Oct 8 00:32:21 2024 MYT.