creators_name: Kanesan , Muthusamy creators_name: Ishii, Hiroaki creators_name: Mohri, Shintaro creators_name: Masuda, Teruo type: conference_item datestamp: 2011-11-03 06:08:58 lastmod: 2011-11-03 06:08:58 metadata_visibility: show corp_creators: Open University Malaysia title: Beam Search Approach for the Multiobjective Flow-shop Scheduling Problem ispublished: pub subjects: TS full_text_status: none pres_type: paper keywords: Beam search, Flow-shop, Gap concept, Multiobjective, Non-dominated solutions abstract: In this paper, we address the problem of minimizing maximum completion time and average flow-time simultaneously in a flow-shop environment. We formulate the problem as a bi-criteria flow-shop scheduling problem in which it minimizes the maximum completion time and average flow-time. We develop and propose an approximation algorithm to find the non-dominated solutions for the above problem. As a solution technique, we propose a new approach based on the beam search with gap concept. (Abstract by authors) date: 2000 event_title: Scheduling Symposium 2000 event_location: Hamamatsu, Japan event_type: conference refereed: TRUE citation: Kanesan , Muthusamy and Ishii, Hiroaki and Mohri, Shintaro and Masuda, Teruo (2000) Beam Search Approach for the Multiobjective Flow-shop Scheduling Problem. In: Scheduling Symposium 2000, Hamamatsu, Japan.